Step 1 : Brush and cutthe end fluid
- Drop the cut end liquid into the bottle upper middle
- Drop indicator.
- Mixing (ratio: 1 Drop Indicator + 25 ml Cut and fluid).
- Dip with 2# brush Right amount of cut and fluid Not too much.
- The first pass of vertical painting Cut 1/3.
- Second pass of horizontal brushing maxillary margin.
- Brush along the ridge.
Step 2 : Step 2: Immersion (60s)
- Pour the Staining solution Can cover the entire repair Complex.
- Put in the restoration, Simultaneous timing.
- Use plastic tweezers gently Shake restoration, drain Remove bubbles.
Step 3 : Drying
- Drying tools : oven.
- Drying temperature: 70 C.
- Drying time : Single crown, under 6 units, minimum drying time is 20 mins.
- The minimum drying time for bridges of 6 units and above is completed follow the sintering curve specified by Aicte.
Drying before rapid sintering:
- Drying tools: oven.
- Drying temperature : 150 C
- Drying time : 30 min
- After the operation is completed, follow the sintering curve specified by Aidite
Reviews
There are no reviews yet.